Contract 73354 REL 100: 2007-155-00 EXP SUPPORT DESIGN OF YN STURGEON HATCHERY
Project Number:
Title:
Develop a Master Plan for a Rearing Facility to Enhance Selected Populations of White Sturgeon in the Columbia River Basin
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Columbia Lower Middle 100.00%
Contract Number:
73354 REL 100
Contract Title:
2007-155-00 EXP SUPPORT DESIGN OF YN STURGEON HATCHERY
Contract Continuation:
Previous: Next:
73354 REL 82: 2007-155-00 EXP SUPPORT DESIGN OF YN STURGEON HATCHERY
Contract Status:
Issued
Contract Description:
This coming contract year will see an number of major tasks completed, including the Water Plan, the engineering MOA, final infiltration gallery and well testing, and the engineering design.  These tasks and their associated milestones will set the stage for the initiation of the EC and final Master Plan edits in preparation for the completion of Step 2 of the 3 Step Process within the next couple of years.  
Account Type(s):
Expense
Contract Start Date:
09/01/2023
Contract End Date:
08/31/2024
Current Contract Value:
$144,457
Expenditures:
$53,291

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Contract Development and Direction 08/31/2024
Water Plan completed C: 174. Water Evaluations at Marion Drain Hatchery Site 08/31/2024
Meeting notes D: 189. Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin 08/31/2024
EC documents F: 165. STEP 2: Assist with NEPA process contracted by BPA 08/31/2024
Final Design Report G: 175. Preliminary Design of the Marion Drain Sturgeon facility 08/31/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 1 instance of WE 196 Council Step Process
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Contract Development and Direction
C 174 Water Evaluations at Marion Drain Hatchery Site
D 189 Regional Coordination with Sturgeon Researchers and Managers in the Columbia River Basin
E 196 STEP 2: Master Plan Step 2 Tasks
F 165 STEP 2: Assist with NEPA process contracted by BPA
G 175 Preliminary Design of the Marion Drain Sturgeon facility 08/03/2023
H 132 Submit Progress Report for the period (Sep 2023) to (Aug 2024)